sample img On-Demand
Cutting Optimization Solution
  "One Dimensional Stock Cutting Optimization Solution"
now as "SaaS" (Software as a Service).
Home Free Trial Cutting Plan Pricing Contact us

Login

Email
Password

Forgot Password

Email

Change Password

Username (Email)
Old Password
New Password
Retype New Password

New Registration

User Email
Password
Retype New Password

Generate Cutting Plan

Note: Please login before using for authentication

All the paid users can upload the demand file here. The format for demand file is described in below sections.

Generate Cutting Plan
Upload your demand file (format given below)


You will be prompted to save the result file.

Input File Format:
  1. First line should have
    "Stock Length" then tab/space then Stock Length
  2. Second line should have two columns
    "Length" then tab/space then "Count"
  3. All remaining lines should have 2 columns
    Piece length then tab/space then Number of Pieces
  4. Note: "Piece Length" should never be more than "Stock Length"
SampleInput.txt
Stock Length  100
Length		Count
97		 	45
61		 	36
49		 	31
21		 	14
75		 	35
12		 	24
10		 	55
			

Result File Format:
ResultCuttingPlan.txt
-------------------------------------
Repeat -- Length(Freq), Length(Freq)
-------------------------------------
10--55(1), 35(1)
48--45(2)
30--36(2)
19--35(1), 31(2)
12--35(2), 24(1)
10--35(2), 14(2)
 1--45(1), 36(1), 14(1)
 1--35(2)
 1--31(1)
-------------------------------------
Total Pipes Required : 132
Total wastage  12.6%
(if single 13200 feet pipe available)

How to read cutting plan:
Read first line as:
Cut 1 piece of 55, 1 piece of 35 from 1 pipe (100 feet) and repeat this process 10 times


For any enquiry mail to
Copyright © 2009 - CutSolution.com